Thursday, September 1, 2011

The I-15 Ultra speed BRT project and Shannon

If we can load a plane with channel theory, then lets fill a passenger transport between the LA basin and the Vegas Strip.

The high speed, digitally managed lanes run up the I-15 meridian between Riverside and Las Vegas. It runs these multi carriage buses at 140 MPH, feeding 200 passengers per bus onto the strip. Let's call these buses the Higgs Boson.

What is our Gibbs separation? The time it takes to load/unload 200 passengers. We got spin with the proper exclusion. (load/unload 200 but not load 400). Buses make round trip, we got angular momentum. Easy solution, we can pack the corridor with way more passengers then any can conceive of.

That's a lot of redundancy, we requantize and get get great gains. We dump passengers onto the strip in convoys with 2000 per group. This allows the casino hotels to get great economies of scale, they would have staff run the booking system for 30 minutes every six hours. They avoid the random arrival problem of the car.

The casinos become very convenient week end cabin retreats for 10 million LA residents.

No comments: